Haris Dawood
QA/QC Engineer and PMC Consultant with 8+ years of experience across Saudi Arabia and India. His work spans commercial, infrastructure, industrial, and aviation projects, covering technical submittals, inspections, ITPs, NCR management, material testing, and construction quality control. He currently represents the PMC on a major mall development in Buraidah, Saudi Arabia.
PMP® · ISO 9001:2015 Lead Auditor · Saudi Council of Engineers accredited
Buraidah Tijan Mall
Representing the PMC on the Buraidah Tijan Mall development, with responsibility for contractor quality compliance, technical reviews, site inspections, NCR resolution, coordination and project close-out.
View Project →Quality control, from review to handover.
Quality Assurance & Control
Inspection, testing and compliance with project specifications and applicable ASTM, ACI, BS and ISO standards.
Technical Review
Technical submittals, shop drawings, ITPs, method statements, material approvals and quality documentation.
Site Quality
Structural works, utilities, finishing, excavation, backfilling, material inspections, snagging and handover.
PMC Coordination
Working with contractors, consultants and client teams to resolve quality issues and keep approved procedures moving through execution.
Three projects. Three different QA/QC environments.
From a major commercial development and large-scale urban infrastructure to Saudi Arabia's first EV manufacturing facility, each project added a different dimension to his experience.
Buraidah Tijan Mall
PMC-side QA/QC for a major mall development, covering technical submittals, site inspections, material approvals, factory inspections and coordination with contractors and project stakeholders.
Read the case study →
King Salman Park
QA/QC for utility infrastructure including sanitary, stormwater, firefighting, chilled-water and potable-water systems, with inspections, testing, as-built documentation and handover support.
Read the case study →
CEER Automotive Project
QA/QC for structural and concreting works on an automotive manufacturing project, covering ITPs, method statements, material testing, WIRs, NCRs and handover documentation.
Read the case study →Project records, not stock imagery.
Selected inspection and factory acceptance records from the Buraidah Tijan Mall project, documenting quality checks witnessed as part of the PMC role.

